Files
evolution/libical/design-data/status.txt
Seth Alves c2e1263462 This commit was generated by cvs2svn to compensate for changes in r1879,
which included commits to RCS files with non-trunk default branches.

svn path=/trunk/; revision=1880
2000-02-21 13:19:28 +00:00

33 lines
1.3 KiB
Plaintext

2.0 Success.
2.1 Success but fallback taken on one or more property values.
2.2 Success, invalid property ignored.
2.3 Success, invalid property parameter ignored.
2.4 Success, unknown non-standard property ignored.
2.5 Success, unknown non-standard property value ignored.
2.6 Success, invalid calendar component ignored.
2.7 Success, request forwarded to Calendar User.
2.8 Success, repeating event ignored. Scheduled as a single component.
2.9 Success, truncated end date time to date boundary.
2.10 Success, repeating VTODO ignored. Scheduled as a single VTODO.
2.11 Success, unbounded RRULE clipped at some finite number of instances
3.0 Invalid property name.
3.1 Invalid property value.
3.2 Invalid property parameter.
3.3 Invalid property parameter value.
3.4 Invalid calendar component sequence.
3.5 Invalid date or time.
3.6 Invalid rule.
3.7 Invalid Calendar User.
3.8 No authority.
3.9 Unsupported version.
3.10 Request entity too large.
3.11 Required component or property missing.
3.12 Unknown component or property found
3.13 Unsupported component or property found
3.14 Unsupported capability
4.0 Event conflict. Date/time is busy.
5.0 Request MAY supported.
5.1 Service unavailable.
5.2 Invalid calendar service.
5.3 No scheduling support for user.